Been 25 days since we shifted to our house, things and life is slowly settling down to
breathe enough but still the sofa set is unvarnished and some touch up work
pending on main door, we’re back on track. I got some books to read and some
waiting to be finished, and as I caught with cold on other hand keep me away
from here and I’m really having some good, relaxing time by reading and
listening to music to keeps me away from other distractions I’m going through
these days. I got to sky watch more
often these days, from the balcony and through door and window it feels pleasant
to go through the changes every day, time and motion and you can expect more
sky shots from now where I watch sky from wake up to sleep.
Our
house is built on 800 sqft and the partial building was 35 years old, and the
front part is 20 years and 2 feet higher than the former part, so a kitchen and
bedroom went at the lower part and the hall and our bedroom and veranda is few
steps above. Due to lack of financial support, then, only partial building was rebuilt
and attached with the older part that was low at floor. As you know it’s a first
floor portion and we moved out mainly to the difficulty of climbing up and
down, carrying me all the way, but we have moved back as we could afford a hydraulic
lift to elevate me, we decided to adjust with few steps climbing down to kitchen
and bro’s bedroom. And I will leave you with couple of collages made on the interior
of the house, which I hope you all would like. I could share some more in upcoming
days.
The four frames on our living room and the wooden sofa set (in distracting way) is longing for varnish which has been put hold and incomplete by the workers. |
We had bi fold doors for our bedroom to easy access through wheelchair and the door ways are widen more than 3 feet for the same. We have open space opposite to our bedroom for more light and air. |